DESIGNING...
We're providing dedicated support to homeowners affected by the LA wildfires.Learn More
Back to BlogCommercial Structural Engineering

Steel Building Structural Engineering in Pomona: Complete Commercial Guide 2026

Published: January 8, 2026
14 min read
By AAA Engineering Team

Updated: January 2026

* AAA Engineering Design: California PE Licensed | 20 + Years Experience | 500 + Projects | Free Consultations *

Steel building structural engineering delivers unmatched strength, versatility, and clear - span capabilities for commercial and industrial projects throughout Pomona, Claremont, La Verne, and the eastern Los Angeles County region.Our licensed Professional Engineers with over 20 years of combined experience specialize in steel frame structural design that meets California's demanding seismic requirements while optimizing construction efficiency and cost. Understanding steel building engineering is essential for developers, property owners, and contractors pursuing commercial construction in this growing Inland Valley market.

Pomona's strategic location along the I-10 corridor between Los Angeles and the Inland Empire has made it a hub for industrial, commercial, and institutional development. Steel construction offers the clear spans, flexibility, and speed of erection that modern commercial projects demand, making it the preferred structural system for warehouses, manufacturing facilities, and large retail buildings throughout the region.

What Is Steel Building Structural Engineering ?

** Direct Answer:** Steel building structural engineering involves the design and analysis of structural systems using steel members including wide-flange beams, columns, and connections that form the building's primary load-carrying framework. This engineering specialty requires expertise in steel behavior, connection design, seismic detailing, and California Building Code compliance to ensure steel structures safely resist gravity loads, wind forces, and earthquake demands while meeting architectural and functional requirements.

Steel frame construction has been the backbone of commercial and industrial building in California for over a century.The material's high strength-to-weight ratio allows for longer spans, taller buildings, and more open floor plans than most other structural systems. For commercial development in Pomona and the Inland Valley, steel construction offers specific advantages.

Modern steel building design encompasses various structural systems:

  • Moment - resisting frames for flexibility and open plans
  • Braced frames for efficient lateral resistance
  • Steel special moment frames for high - seismic zones
  • Ordinary and intermediate moment frames where permitted
  • Steel deck with concrete fill for floor and roof diaphragms

Ourstructural engineering services include comprehensive steel building design from preliminary concepts through construction support.

What Types of Steel Commercial Buildings Are Common in Pomona ?

** Direct Answer:** The most common steel commercial buildings in Pomona include distribution warehouses, manufacturing facilities, pre - engineered metal buildings, retail centers with steel frames, and institutional buildings.The region's industrial character and proximity to major transportation corridors drives demand for steel structures that offer clear spans, flexible layouts, and rapid construction schedules.

** Distribution and Warehouse Facilities **

Pomona's location along I-10 and SR-60 makes it prime territory for logistics and distribution operations. Modern warehouse facilities increasingly require:

- Clear heights of 32'-40' or more - Clear spans exceeding 100' without interior columns - Heavy floor loads for racking systems - Multiple dock positions with specific structural requirements - Fire sprinkler mezzanine loading requirements

Steel frame construction efficiently meets these demands.Warehouses in Pomona, Ontario, Chino, and the surrounding Inland Valley commonly use steel frames with steel deck roofing.

Manufacturing and Industrial Buildings

Industrial facilities in Pomona require structural systems that accommodate:

  • Heavy equipment loads and vibration considerations
  • Overhead crane systems with supporting runway beams
  • Expansion flexibility for changing operations
  • Clear spans for material handling efficiency
  • Specialized foundation systems for equipment

Steel construction excels in these applications, providing the strength and adaptability manufacturing operations demand.

Pre - Engineered Metal Buildings

Pre - engineered metal buildings(PEMBs) offer economical solutions for: - Light industrial buildings - Aircraft hangars and maintenance facilities - Agricultural buildings - Vehicle storage and maintenance shops - Smaller warehouse operations

These buildings use proprietary steel systems designed by the manufacturer, though local structural engineer review is typically required for permit approval in California.

Retail and Commercial Buildings

Steel frame construction serves retail development including:

  • Big - box retail stores requiring long spans
  • Grocery stores with specific floor load requirements
  • Strip mall structures with flexible tenant spaces
  • Mixed - use buildings with parking structures

The Pomona Fairplex area and downtown revitalization have generated significant retail development activity.

How Does the Steel Structural Engineering Process Work ?

** Direct Answer:** The steel structural engineering process typically takes 6 - 10 weeks from initial consultation to permit - ready plans for commercial buildings.The process includes project evaluation and concept development, structural system selection, steel frame design and analysis, connection design and detailing, and PE - stamped construction document preparation.Licensed Professional Engineers guide each phase, ensuring California Building Code compliance and efficient permit processing with Pomona and Los Angeles County building departments.

Phase 1: Project Evaluation and System Selection(Week 1 - 2)

Steel building design begins with thorough project understanding:

- Building size, configuration, and use requirements - Clear span and clear height needs - Site conditions and geotechnical information - Seismic design parameters for the location - Architectural requirements and facade systems - Fire rating and code requirements - Budget and schedule constraints

For Pomona projects, we evaluate whether conventional steel frame, pre - engineered, or hybrid systems best meet project goals.

System Selection Considerations:

| System Type | Best Application | Typical Spans | Cost Level | | -------------| -----------------| ---------------| ------------| | Conventional Steel | Custom buildings, high seismic | 40'-100' + | Higher | | Pre - Engineered | Standard industrial, warehouses | 60'-150' | Lower | | Hybrid | Complex buildings with standard areas | Varies | Medium |

Phase 2: Structural Analysis and Design(Week 2 - 5)

Comprehensive structural analysis includes:

** Gravity Load Analysis ** - Dead loads: steel self - weight, roof deck, MEP systems - Live loads: roof live, collateral loads, occupancy - Floor loads: storage, equipment, vehicle traffic - Snow loads(minimal in Pomona but code - required check)

** Lateral Load Analysis ** - Seismic force calculation per ASCE 7 and CBC - Wind load determination(exposure, topography) - Drift analysis and story drift limits - P - delta effects for taller buildings

** Steel Member Design ** - Beam sizing for strength and serviceability - Column design including slenderness effects - Bracing member design - Connection force determination

** Phase 3: Connection Design and Detailing(Week 5 - 7) **

Steel connections often govern structural performance:

** Moment Connections ** - Beam - to - column moment connections for seismic frames - Pre - qualified connections per AISC 358 - Weld details and access requirements - Column continuity plate and doubler plate design

** Shear Connections ** - Standard shear tab connections - Seated connections - Extended end plate connections - Single and double angle connections

** Bracing Connections ** - Gusset plate design - Work point geometry - Net section and block shear checks

** Phase 4: Construction Document Development(Week 7 - 10) **

Structural drawings typically include:

  • Foundation plans with anchor bolt layouts
  • Framing plans at each level
  • Steel frame elevations
  • Connection details and schedules
  • Roof framing and deck plans
  • Structural notes and specifications

> 📞 ** Need Steel Building Engineering in Pomona ?** Our licensed California PEs provide free consultations. > ** Call(949) 981 - 4448 ** | ** Request Free Quote → **

What Are the Seismic Design Requirements for Steel Buildings in Pomona ?

** Direct Answer:** Pomona is classified as Seismic Design Category D, requiring rigorous seismic design for steel buildings including special concentrically braced frames(SCBF), special moment frames(SMF), or other high - ductility systems.The region's proximity to multiple active faults means steel structures must be designed with specific connection details, member proportioning limits, and capacity design principles to ensure ductile behavior during major earthquakes.

** Seismic Design Category D Requirements **

Pomona's seismic design parameters reflect: - Site Class determination(typically C or D) - Mapped spectral acceleration values - Risk Category based on building use - Resulting SDC D classification for most buildings

** Permitted Steel Seismic Systems for SDC D:**

| System | R Factor | Height Limit | Typical Use | | --------| ----------| --------------| -------------| | Special Moment Frame(SMF) | 8 | Unlimited | Office, institutional | | Special Concentrically Braced Frame(SCBF) | 6 | 160' | Industrial, warehouse | | Eccentrically Braced Frame(EBF) | 8 | 160' | Multi-story buildings | | Buckling - Restrained Braced Frame(BRBF) | 8 | 160' | Performance-based |

** Special Moment Frame Requirements **

When SMF systems are used:

  • Pre - qualified beam - to - column connections
  • Strong column - weak beam design
  • Panel zone strength checks
  • Column splice requirements
  • Lateral bracing of beams

** Special Concentrically Braced Frame Requirements **

For SCBF systems(common in industrial buildings):

  • Brace slenderness limits
  • V - brace and inverted V - brace restrictions
  • Connection design for expected brace capacity
  • Column design for maximum brace forces
  • Balanced V - brace restrictions in SDC D

** Regional Fault Considerations **

Pomona's seismic hazard reflects proximity to: - San Andreas Fault: ~25 miles north - San Jose Fault: Running through the city - Walnut Creek Fault: Active fault in the area - Chino Fault: To the east

Near - fault effects may apply for projects very close to mapped fault traces.

How Much Does Steel Structural Engineering Cost in the Inland Valley ?

** Direct Answer(2026 Pricing):** Steel structural engineering in Pomona and the Inland Valley typically costs $10,000 -$50,000 + depending on building size and complexity.Simple pre - engineered metal building engineering runs $5,000 -$12,000.Conventional steel frame warehouses(20,000 - 100,000 SF) average $15,000 -$35,000.Complex multi - story buildings or facilities with crane systems may reach $40,000 -$75,000 +.

Pricing by Building Type and Size

** Pre - Engineered Metal Buildings ** - Small PEMB(under 10,000 SF): $5,000 -$10,000 - Medium PEMB(10,000 - 30,000 SF): $8,000 -$15,000 - Large PEMB(30,000 + SF): $12,000 -$25,000 - * Note: PEMB engineering often reviews manufacturer designs rather than creating from scratch *

** Conventional Steel Frame Buildings ** - Small commercial(under 10,000 SF): $10,000 -$18,000 - Medium warehouse(10,000 - 50,000 SF): $15,000 -$30,000 - Large distribution(50,000 - 200,000 SF): $25,000 -$50,000 - Very large facilities(200,000 + SF): $50,000 -$100,000 +

** Specialty Steel Buildings ** - Buildings with crane systems: Add $5,000 -$15,000 - Multi - story structures: Higher per - SF costs - High seismic or complex geometry: Premium pricing

** Factors Affecting Cost **

- ** Building complexity **: Simple rectangular vs.irregular shapes - ** Height and spans **: Taller, longer spans require more design - ** Seismic system **: SMF more complex than SCBF - ** Connection complexity **: Custom vs.standard connections - ** Foundation conditions **: Poor soils affect coordination - ** Special requirements **: Cranes, heavy equipment, blast resistance

> 📞 ** Planning a Steel Building Project ?** Get a detailed engineering quote. > ** Call(949) 981 - 4448 ** | ** Request Free Estimate → **

What Are the Steel Material and Fabrication Requirements ?

** Direct Answer:** California steel construction requires structural steel conforming to ASTM specifications—most commonly A992 for wide - flange shapes, A500 for HSS tubes, and A36 for plates.Fabrication must comply with AISC standards with certified fabricators and erectors.Welding procedures require pre - qualified or engineer - approved procedures, and critical connections require special inspection per CBC Chapter 17.

** Common Steel Grades **

** Wide - Flange Shapes(W, M, HP sections) ** - ASTM A992: Fy = 50 ksi(standard for building construction) - ASTM A572 Gr 50: Alternative 50 ksi material - ASTM A36: Fy = 36 ksi(older specification, still used)

** HSS and Pipe ** - ASTM A500 Grade B: Fy = 46 ksi(rectangular HSS) - ASTM A500 Grade C: Fy = 50 ksi(round HSS) - ASTM A53 Grade B: Fy = 35 ksi(pipe)

** Plates and Connection Material ** - ASTM A36: Fy = 36 ksi(most common for plates) - ASTM A572 Gr 50: Higher strength plates

** Bolts ** - ASTM A325: Standard structural bolts - ASTM A490: High - strength bolts - ASTM F1852: Twist - off type tension control bolts

** Fabrication Requirements **

** Quality Assurance ** - AISC Certified Fabricator(Standard or Major) - Quality Control Program documentation - Shop drawing review and approval - Material test reports(MTRs)

** Welding Requirements ** - Certified welders per AWS D1.1 - Pre - qualified weld procedures - Welding Procedure Specifications(WPS) - Non - destructive testing for demand critical welds

** Erection Standards ** - OSHA compliant erection procedures - Column plumbness tolerances - Bolt tensioning verification - Anchor rod placement accuracy

What Special Inspections Are Required for Steel Construction ?

** Direct Answer:** Steel construction in California requires extensive special inspection including shop and field welding inspection, bolted connection inspection, and structural steel elements verification.High - seismic regions like Pomona require additional inspection of seismic force - resisting system components.A qualified special inspector must be present during critical construction activities, with engineer of record structural observation at key milestones.

Shop Inspection Requirements

Before steel arrives at site:

  • Shop welding inspection(continuous or periodic)
  • NDT of demand critical welds
  • Material verification and traceability
  • Dimensional checks per approved shop drawings
  • Surface preparation and coatings inspection

** Field Inspection Requirements **

During erection:

  • Anchor rod placement verification
  • Column base plate grouting
  • Field welding inspection
  • Bolted connection inspection:
  • Snug - tight joints: Visual
  • Pretensioned joints: Torque or turn - of - nut verification
  • Slip - critical joints: Faying surface and tension verification
  • Member placement and alignment

** Seismic System Inspections(SDC D) **

Enhanced inspection for seismic systems: - Special moment frame connection welds(100 % NDT) - Brace connections in SCBF - Link beam connections in EBF - Protected zone verification

** Testing Requirements **

- Bolt tension testing(calibrated wrench or DTI) - Weld NDT: Visual, MT, PT, UT, or RT as specified - Concrete strength for composite systems - Grout strength for column bases

Ourstructural engineering services coordinate with qualified inspection agencies for Pomona projects.

What Are Common Steel Engineering Challenges in the Inland Valley ?

** Direct Answer:** Common steel engineering challenges in Pomona include designing efficient seismic - resisting systems for high - seismic zones, coordinating steel with other building systems, managing deflection and drift limits, and addressing constructability constraints.Professional Engineers address these through careful system selection, detailed analysis, and construction - focused design approaches that minimize field complications.

Challenge 1: Seismic System Efficiency

** Problem:** SDC D requires high - ductility systems that can increase steel tonnage and fabrication complexity if not optimized.

** Pomona Example:** A recent warehouse project initially specified SMF throughout, resulting in heavy steel and expensive connections.Redesign with SCBF reduced steel cost by 20 %.

** Solution:** Optimize seismic system selection based on building configuration.Use braced frames where plan allows, reserving moment frames for perimeter or where open spans required.Consider BRBF for balanced stiffness and drift control.

Challenge 2: Steel Deck Diaphragm Design

** Problem:** Large warehouse buildings require careful diaphragm design to transfer seismic forces to vertical - resisting elements without excessive flexibility.

** Solution:** - Appropriate deck gauge and fastening pattern - Collector elements at braced frame lines - Chord reinforcement at diaphragm edges - Consider fill or high - profile deck for larger diaphragms

** Challenge 3: Foundation Coordination **

** Problem:** Steel frames generate concentrated foundation loads requiring coordination between structural engineer and geotechnical engineer.

** Pomona Example:** Sites with variable soil conditions may require drilled piers or ground improvement beneath heavily - loaded columns.

** Solution:** Early geotechnical investigation, foundation load optimization, and consideration of alternative foundation systems where appropriate.

Challenge 4: Erection and Constructability

** Problem:** Complex connection details can slow fabrication and erection, increasing costs.

** Solution:** - Use standard connection types where possible - Coordinate connection access for bolting and welding - Consider erection sequence in connection design - Pre - construction coordination meetings

Why Choose AAA Engineering Design for Steel Projects in Pomona ?

** Direct Answer:** AAA Engineering Design provides California PE - licensed steel structural engineering with 20 + years of experience across Los Angeles County and the Inland Empire.We've completed 100+ steel building projects from pre-engineered metal buildings to complex industrial facilities, providing efficient permit processing through established relationships with building departments. Our seismic design expertise and construction-focused approach deliver cost-effective, buildable solutions.

** Inland Valley Expertise **

We've designed steel buildings throughout the region including: - Pomona: Distribution centers, manufacturing facilities - Claremont: Institutional and commercial buildings - La Verne: Industrial and educational facilities - Ontario: Logistics and warehouse complexes - Chino / Chino Hills: Industrial parks and commercial centers

** Our Steel Design Capabilities **

- Conventional steel frame buildings - Pre - engineered metal building review - Steel moment frame systems - Braced frame systems(SCBF, OCBF, BRBF) - Crane - supporting structures - Steel deck and composite floor systems - Connection design and detailing - Seismic retrofit of existing steel buildings

** What Clients Say **

"AAA Engineering delivered our steel warehouse plans ahead of schedule. Their attention to constructability saved us significant costs during erection." > — ** Robert K., General Contractor, Pomona **
"The steel frame design for our manufacturing facility perfectly accommodated our overhead crane requirements. Professional service from start to finish." > — ** Jennifer M., Facility Manager, Ontario **

Our Pomona Track Record: - 🏗️ 100 + steel building projects in Los Angeles and Inland Empire - ⏱️ Average permit approval: 4 - 6 weeks - ⭐ 4.9 / 5 Google rating from commercial clients - 🔄 90 % first - time permit approval rate

Frequently Asked Questions

** Do I need a structural engineer for a pre - engineered metal building ?**

Yes, even though PEMB manufacturers provide structural designs, California typically requires local structural engineer review for permit approval.The local engineer verifies seismic design parameters, foundation design adequacy, and compliance with California Building Code requirements.This review protects building owners and ensures structures meet local conditions.

What is the difference between steel moment frames and braced frames ?

Moment frames resist lateral loads through bending of beams and columns at rigid connections, providing open floor plans without diagonal braces.Braced frames use diagonal members to resist lateral loads through axial forces, offering greater stiffness but requiring acceptance of braces in the space.SDC D requires special detailing for either system.

How long do steel building permits take in Pomona ?

Typical permit processing in Pomona takes 4 - 6 weeks for commercial steel buildings, similar to most Los Angeles County jurisdictions.Complex projects or those requiring planning approval may take longer.We coordinate with the building department to address comments efficiently.

Can steel buildings be designed for crane loads ?

Yes, steel frames are ideal for crane - supporting structures.Crane loads include vertical wheel loads, horizontal thrust from crane travel and trolley motion, and impact factors.Runway beams, crane columns, and foundations require specific design for these dynamic loads.

What is the typical steel tonnage for commercial buildings ?

Steel tonnage varies significantly based on building type and spans:

  • Light commercial: 3 - 5 psf of building area
  • Warehouses: 4 - 7 psf
  • Multi - story: 8 - 15 psf
  • Heavy industrial with cranes: 8 - 12 + psf

** Is steel construction more expensive than concrete or wood ?**

Steel competes favorably for spans exceeding 40 - 50 feet where wood becomes impractical and concrete requires expensive formwork.Steel offers faster erection, predictable quality from factory fabrication, and design flexibility.Total building cost comparisons require full analysis including foundation, speed of construction, and long - term maintenance.

What fire protection is required for steel buildings ?

Fire protection requirements depend on building use, size, and construction type.Options include:

  • Spray - applied fireproofing(SFRM)
  • Intumescent coatings
  • Board products
  • Concrete encasement
  • Membrane protection(ceilings)

Warehouses and industrial buildings often qualify for unprotected steel when properly designed per CBC fire separation requirements.

---

🔧 Need Steel Structural Engineering Services in Pomona ?

Our California - licensed Professional Engineers are ready to help with your commercial steel building project.

** What You Get:** ✅ Free initial consultation(phone or in -person) ✅ Detailed written estimate within 48 hours ✅ PE - stamped plans accepted by all Los Angeles County building departments ✅ Fast turnaround: Most projects completed in 6 - 10 weeks

** 📞 Call(949) 981 - 4448 ** | ** Request Free Quote → **

* Serving Pomona, Claremont, La Verne, Ontario, and all of the Inland Valley *

---

Continue exploring our engineering insights:

-Commercial & Industrial Structural Engineering Guide - Warehouse Structural Engineering in Ontario - Industrial Facility Structural Engineering in El Cajon

View All Articles →

Need Professional Engineering Services?

Our licensed Professional Engineers are ready to help with your project. Get a free consultation to discuss your structural engineering needs.

Related Articles

Continue exploring our engineering insights

Commercial Projects
Jan 15
14 min read

Data Center Structural Engineering in San Jose: Complete 2026 Guide

Data center structural engineering in San Jose. Learn about mission-critical facility design, redundant systems, and seismic requirements. Licensed CA Professional Engineers. Call (949) 981-4448.

Design & Planning
Jan 15
11 min read

MEP Engineer Near Me in Fullerton: Find Local Building Systems Experts 2026

MEP engineer near me in Fullerton. Find licensed mechanical, electrical, and plumbing engineers for commercial and residential projects. Call (949) 981-4448 for consultation.

Design & Planning
Jan 15
11 min read

Civil Engineer Near Me in Garden Grove: Find Local Site Development Experts 2026

Civil engineer near me in Garden Grove. Find licensed PE engineers for site development, grading, drainage, and permits. Call (949) 981-4448 for consultation.

Get Started

Ready to Start Your Project?

Get a free consultation and detailed quote for your engineering project. Our licensed Professional Engineers are ready to help bring your vision to life.

Contact Information

Office

8031 Main Street
Stanton, CA 90680

Business Hours

Monday-Friday 9:00 AM - 5:00 PM

Saturday Closed

Sunday Closed

Why Choose Us?

Free consultation & quote
24-hour response guarantee
Licensed Professional Engineers
100% satisfaction guarantee

Get Your Free Consultation

Complete the form and receive your consultation within 24 hours.

Personal Details

Project Details

We respect your privacy and never share your information.

Expert Online

Have a question about your project? Get a free consultation now.