Septic Design Engineers in San Clemente CA: Complete 2025 Guide

November 6, 2025
10 min read
By AAA Engineering Team

Septic system design engineering is essential for residential properties in San Clemente where municipal sewer connections aren't available. Whether you're building a custom home in Talega, adding an ADU in Southwest San Clemente, or replacing a failing system in Forster Ranch, understanding septic engineering requirements ensures your project meets Orange County Environmental Health standards and functions reliably for decades.

Introduction: Septic Engineering in San Clemente

**Septic design engineering involves creating wastewater treatment systems that safely process household sewage on-site without connection to city sewer.** Licensed civil engineers design these systems to meet strict health and environmental regulations.

Why San Clemente properties need septic engineers:

  • **Orange County Environmental Health:** Strict permitting and design requirements
  • **Coastal Protection:** Special requirements near Trestles, San Clemente State Beach
  • **Soil Variability:** From sandy coastal soils to clay inland, each requires specific design
  • **High Water Table:** Some areas have seasonal groundwater close to surface
  • **Property Values:** $1M-$3M+ coastal homes justify proper professional design
  • **Long-Term Liability:** Failed systems create expensive problems and health hazards

What this guide covers:

1. When you need a septic design engineer 2. How septic systems work 3. San Clemente-specific requirements 4. The septic design and permitting process 5. Types of septic systems for different sites 6. Costs and timelines 7. Choosing the right engineer

For related topics, see our guides on residential engineering, custom house engineering, and engineering design principles.

When You Need a Septic Design Engineer

Orange County Environmental Health requires licensed engineer design for most septic systems.

Projects Requiring Septic Engineering

**New Home Construction:**

  • All new homes on septic require engineered design
  • Engineer sizes system based on bedrooms and fixture count
  • Percolation testing required before design
  • Must show adequate reserve area for future replacement

**ADU or Second Dwelling:**

  • Adding ADU increases wastewater load
  • Existing septic may need expansion or replacement
  • Engineer evaluates existing system capacity
  • Alternative systems often needed if space limited

**System Replacement:**

  • Failing septic systems must be replaced with engineered design
  • Cannot simply replace "like for like" without engineering
  • Opportunity to upgrade to better system
  • Required if adding bedrooms or bathrooms

**System Expansion:**

  • Adding bedrooms or bathrooms increases design flow
  • Existing system may need expansion
  • Engineer evaluates if expansion feasible
  • May require full replacement if inadequate

**Commercial or Multi-Family:**

  • All commercial septic requires engineering
  • Multi-family (4+ units) requires commercial-grade system
  • Higher complexity and regulatory oversight

**Alternative/Advanced Systems:**

  • Any non-conventional septic requires engineering
  • ATU (Aerobic Treatment Unit), mound systems, etc.
  • Orange County pre-approves specific system types

When Septic Engineering May Not Be Required

**Minor Repairs:**

  • Pump replacement
  • Distribution box repair
  • Pipe repair/unclogging
  • Tank lid replacement

**Note:** Even repairs may trigger engineering if system is undersized or failing.

How Septic Systems Work

Understanding basic septic function helps you discuss design with your engineer.

Conventional Septic System Components

**1. Septic Tank**

  • **Function:** Primary treatment, solids settle, grease floats
  • **Size:** Based on daily design flow (bedrooms + fixtures)
  • **Typical:** 1,000-1,500 gallons for 3-4 bedroom home
  • **Material:** Concrete (most common), fiberglass, or polyethylene
  • **Chambers:** Usually 2-chamber for better treatment
  • **Maintenance:** Pump every 3-5 years

**2. Distribution Box**

  • **Function:** Evenly distributes effluent to leach field
  • **Ensures:** Equal flow to all trenches
  • **Critical:** Must be level for proper distribution

**3. Leach Field (Drainfield)**

  • **Function:** Final treatment and dispersal into soil
  • **Design:** Perforated pipes in gravel-filled trenches
  • **Sizing:** Based on soil percolation rate and design flow
  • **Typical:** 500-1,500 sq ft for residential
  • **Depth:** Usually 18-36 inches below grade

**4. Soil Treatment**

  • **Function:** Natural biological treatment as effluent percolates
  • **Critical:** Adequate separation from groundwater (5+ feet typical)
  • **Aerobic zone:** Upper 2-3 feet of soil provides treatment

How It Works (Step-by-Step)

1. **Wastewater** from home flows to septic tank 2. **Solids settle** to bottom, grease floats to top 3. **Clarified effluent** flows to distribution box 4. **Distribution** to leach field trenches 5. **Percolation** through gravel and into soil 6. **Biological treatment** in aerobic soil zone 7. **Groundwater recharge** after treatment

Alternative System Types

**Aerobic Treatment Unit (ATU):**

  • Uses oxygen and bacteria for enhanced treatment
  • Produces cleaner effluent than septic tank alone
  • Requires electricity and regular maintenance
  • Allows smaller leach field or disposal to lower-quality soils
  • More expensive: $10,000-$20,000 additional cost

**Mound System:**

  • Raised leach field above natural grade
  • Used when groundwater too shallow or soil too impermeable
  • Requires pumping from tank to elevated mound
  • Expensive: $25,000-$50,000+ typical
  • Used as last resort in challenging sites

**Drip Dispersal:**

  • Drip emitters distribute effluent evenly
  • Can navigate irregular terrain
  • Requires pump and filtration
  • Good for hillside sites like North San Clemente

**Seepage Pit:**

  • Older technology, rarely approved for new construction
  • May exist on older San Clemente properties
  • Replacement usually requires leach field system

For comprehensive engineering services, see our residential engineering page.

Orange County Environmental Health Requirements

All septic systems in San Clemente must be approved by Orange County Environmental Health Services (OCEHS).

Orange County Septic Permitting Authority

**OC Environmental Health Services:**

  • **Location:** 1241 E. Dyer Rd., Santa Ana, CA 92705
  • **Phone:** (714) 433-6080
  • **Website:** ochealthinfo.com/eh
  • **Jurisdiction:** All unincorporated OC and cities without own health department (includes San Clemente)

**What they regulate:**

  • Septic system design approval
  • Installation permits
  • Percolation testing oversight
  • System inspections
  • Pumper registration
  • Failed system enforcement

Design Standards and Criteria

**Minimum lot size:**

  • 20,000 sq ft typical minimum for conventional septic
  • Smaller lots may qualify if soils are excellent
  • Larger lots required for poor soils

**Setback requirements:**

  • 100 feet from any well
  • 50 feet from property lines
  • 10 feet from structures
  • 5 feet from water lines
  • Additional setbacks from streams, wetlands

**Design flow calculations:**

  • 150 gallons/day per bedroom (minimum 3 bedrooms)
  • Additional for high-water-use fixtures
  • Example: 4-bedroom home = 600 gpd minimum

**Percolation rate requirements:**

  • Must be between 5-60 minutes per inch (MPI)
  • Faster than 5 MPI may need special design
  • Slower than 60 MPI may require alternative system
  • 3-6 test holes required, minimum 6 feet deep

**Groundwater separation:**

  • Minimum 5 feet from seasonal high groundwater to bottom of leach field
  • Some areas require 10 feet
  • Mound systems needed if inadequate separation

**Reserve area:**

  • 100% of primary leach field size must be preserved
  • For future replacement if primary fails
  • Cannot build, pave, or landscape heavily over reserve

**Tank sizing:**

  • Minimum 1,000 gallons for up to 3 bedrooms
  • 1,250 gallons for 4 bedrooms
  • 1,500 gallons for 5 bedrooms
  • Larger tanks beneficial for proper treatment

Coastal and Environmentally Sensitive Areas

San Clemente-specific considerations:

**Near State Beach/Trestles:**

  • Enhanced treatment may be required
  • More stringent setbacks
  • Groundwater monitoring may be required

**Steep slopes:**

  • North San Clemente hillsides
  • May require retaining walls or special distribution
  • Erosion control critical

**High groundwater areas:**

  • Some low-lying areas near San Juan Creek
  • May require mound systems or ATUs
  • Seasonal monitoring required

The Septic Design and Permitting Process

Typical timeline: 8-16 weeks from starting engineering to permit approval.

Phase 1: Initial Consultation and Percolation Testing (Week 1-2)

**Step 1: Meet with engineer**

  • Discuss project (new home, ADU, replacement)
  • Review property survey and site conditions
  • Determine if septic is only option (verify no sewer available)
  • Get cost estimate for design and testing

**Step 2: Percolation testing**

  • Schedule with engineer or testing company
  • Dig 3-6 test holes (6+ feet deep) in proposed leach field area
  • Fill holes with water and measure infiltration rate
  • Test repeated multiple times for accuracy
  • OCEHS inspector may need to witness testing
  • Cost: $1,500-$3,000 depending on site access and number of holes

**Step 3: Soil profile analysis**

  • Engineer evaluates soil layers from test holes
  • Determines depth to limiting layer (clay, hardpan, groundwater)
  • Assesses suitability for conventional vs alternative system

**Deliverables:**

  • Percolation test report with infiltration rates
  • Soil profile description
  • Initial feasibility assessment

Phase 2: Engineering Design (Week 3-5)

**Septic system design:**

  • Tank sizing based on bedrooms and fixtures
  • Leach field sizing based on percolation rate and design flow
  • Distribution box location and design
  • Reserve area delineation
  • Cleanout and access locations

**Site plan preparation:**

  • Topographic survey showing all site features
  • Proposed septic system layout
  • Setbacks from wells, property lines, structures
  • Grading and drainage plan
  • Landscaping restrictions over leach field

**Details and specifications:**

  • Tank specifications (size, material, baffles)
  • Leach field trench details
  • Pipe specifications and installation requirements
  • Backfill material specifications
  • Inspection requirements

**Calculations:**

  • Design flow calculations
  • Leach field sizing calculations
  • Hydraulic calculations for pumped systems (if applicable)

**Engineer deliverables:**

  • Complete septic design plan set
  • Engineering calculations
  • Soils/perc test report
  • Specifications
  • PE stamp and signature

Phase 3: Plan Submittal to Orange County (Week 6)

**Application package:**

  • OCEHS septic system application form
  • Engineered plans (signed and stamped)
  • Percolation test report
  • Soils report (if required)
  • Application fee ($1,200-$2,000+ depending on system size)
  • Property owner authorization
  • Proof of lot size and existing conditions

**Submittal:**

  • Submit online or in-person to OCEHS
  • Assigned to plan reviewer
  • Initial completeness check

Phase 4: Plan Review and Revisions (Week 7-12)

**OCEHS review:**

  • Plan reviewer evaluates design for code compliance
  • Checks sizing calculations
  • Verifies setbacks and reserve area
  • Ensures adequate soil and groundwater separation
  • Initial review: 4-6 weeks typical

**Common corrections:**

  • Clarify reserve area boundaries
  • Add setback dimensions
  • Provide additional calculations
  • Show all existing site features
  • Revise grading for proper drainage

**Resubmittal:**

  • Engineer addresses corrections
  • Revise plans and resubmit
  • Second review: 2-3 weeks
  • May require 2-3 rounds of revisions

**Approval:**

  • OCEHS issues approval letter
  • Good for 2 years (must start construction within 2 years)

Phase 5: Installation Permit and Construction (Week 13+)

**Permit issuance:**

  • After plan approval, pay permit fee
  • Receive installation permit
  • Post permit on site

**Pre-construction:**

  • Hire licensed septic contractor
  • Submit contractor information to OCEHS
  • Schedule required inspections

**Installation:**

  • Excavation and tank setting inspection
  • Leach field trench inspection (before gravel/pipe)
  • Final inspection after backfill
  • Contractor provides as-built drawings

**Occupancy:**

  • Final approval allows building occupancy
  • Homeowner receives maintenance instructions
  • System registered with County

For more on permitting processes, see our building code compliance guide.

Costs for Septic Design Engineering in San Clemente

Septic engineering costs vary by site conditions and system complexity.

Engineering Fees

**Percolation testing:**

  • Simple site (easy access, flat): $1,500-$2,000
  • Moderate site (some slope, decent access): $2,000-$3,000
  • Difficult site (steep, poor access, many test holes): $3,000-$5,000

**Septic design engineering:**

  • Conventional system: $3,000-$5,000
  • Alternative system (ATU, mound, drip): $5,000-$8,000
  • Complex sites or large systems: $8,000-$12,000

**Plan check revisions:**

  • Usually included (1-2 rounds)
  • Extensive revisions: $150-$250/hour

**Construction support:**

  • Inspection services: $300-$500 per visit
  • Contractor coordination: $150-$250/hour

System Installation Costs

**Conventional septic system:**

  • Small (3 BR): $15,000-$25,000
  • Medium (4-5 BR): $20,000-$35,000
  • Includes: tank, distribution box, leach field, installation
  • Does not include: grading, landscaping restoration

**Alternative systems:**

  • ATU (Aerobic Treatment Unit): Add $10,000-$20,000
  • Mound system: $30,000-$60,000+ total
  • Drip dispersal: Add $5,000-$15,000

**Site-specific factors affecting cost:**

  • Rocky soil (requires blasting): +$5,000-$20,000
  • Poor access (hand dig required): +$5,000-$15,000
  • Steep slopes: +$3,000-$10,000
  • High groundwater: May require mound system
  • Large lot (long sewer laterals): +$3,000-$8,000

**Total project costs:**

  • Testing + Design + Permits: $6,000-$12,000
  • Conventional system installation: $20,000-$35,000
  • Total conventional: $26,000-$47,000
  • Alternative system total: $40,000-$80,000+

For cost guidance, see our structural engineer cost guide (similar factors affect septic engineering costs).

Choosing a Septic Design Engineer in San Clemente

Select an engineer with septic expertise, Orange County experience, and good communication.

Essential Qualifications

**Professional licensing:**

  • California-licensed Civil Engineer
  • Verify license at bpelsg.ca.gov
  • Active license with no disciplinary actions

**Septic system expertise:**

  • Minimum 5+ years septic design experience
  • Portfolio of systems approved by Orange County
  • Knowledge of alternative systems and when needed
  • Understanding of Orange County regulations

**San Clemente/Orange County experience:**

  • Multiple systems permitted in Orange County
  • Familiarity with OCEHS review process and staff
  • Knowledge of local soil conditions
  • Experience with San Clemente site challenges (hillsides, coastal areas)

**Coordination capabilities:**

  • Coordinates percolation testing
  • Works with septic contractors
  • Communicates with OCEHS
  • Responds to plan check corrections promptly

Evaluating Engineers

**Interview questions:** 1. How many septic systems have you designed in San Clemente/Orange County? 2. What's your typical timeline from start to permit? 3. What's your plan check approval rate with OCEHS? 4. Do you coordinate perc testing or do I arrange separately? 5. What's included in your fee (testing, design, plan check response)? 6. Have you designed [specific system type] before? 7. Do you provide construction phase support? 8. What happens if my site has challenging conditions? 9. Can you provide references from recent Orange County clients? 10. How do you handle permit revisions and corrections?

**Red flags:**

  • No Orange County septic experience
  • Much lower fees than other engineers (may lack experience)
  • Unclear about process or timeline
  • Poor communication or responsiveness
  • Guarantees approval (no engineer can guarantee)
  • No references from Orange County projects

**Green flags:**

  • 10+ systems approved in Orange County
  • Clear, detailed proposal breaking down costs
  • Responsive communication
  • Proactive about site assessment
  • Good relationship with OCEHS staff
  • Strong client references
  • Experience with variety of system types

For more guidance, see choosing an engineering design firm.

Frequently Asked Questions

Q: How do I know if I need septic or if sewer is available?

A: Contact San Clemente Utilities Department at (949) 361-8489. They'll tell you if sewer is available to your property. Most coastal areas have sewer, but inland and rural areas often require septic.

Q: How much does septic design and installation cost in San Clemente?

A: Total project costs typically $26,000-$47,000 for conventional system (engineering, permits, installation). Alternative systems $40,000-$80,000+. Costs vary significantly based on site conditions.

Q: How long does the septic permitting process take?

A: Typical timeline: 2-3 weeks testing, 2-3 weeks design, 4-8 weeks OCEHS review (with revisions). Total 8-16 weeks from starting engineering to permit. Add 4-8 weeks for construction.

Q: Can I add an ADU if my home has septic?

A: Maybe. Existing septic must have adequate capacity or be expanded/replaced. Engineer evaluates existing system capacity based on age, size, and condition. Many San Clemente septic systems can accommodate small ADU with expansion.

Q: What is percolation testing and how much does it cost?

A: Percolation ("perc") testing measures soil infiltration rate to determine if septic is feasible and size leach field. Requires digging test holes and measuring water absorption. Cost $1,500-$5,000 depending on site access and conditions.

Q: Can I install septic system myself?

A: No. Orange County requires licensed septic contractors. System must be inspected during installation. Engineer must sign off on as-built compliance.

Q: How often does septic need maintenance?

A: Pump tank every 3-5 years (more often for heavy use or small tank). Annual inspection recommended. ATU systems require more frequent maintenance per manufacturer specifications.

Q: What if percolation testing shows poor soils?

A: Poor percolation may require alternative system (ATU, mound, drip dispersal). Engineer evaluates options. Some sites may not be suitable for septic at all—rare but possible.

Q: How big does my lot need to be for septic?

A: Typically 20,000 sq ft minimum for conventional system. Smaller lots may work with excellent soils. Engineer evaluates based on soils, setbacks, and reserve area requirements.

Q: Can I landscape over my leach field?

A: Yes, but with restrictions. Only shallow-rooted grass and plants allowed. No trees, shrubs, hardscape, or structures over leach field or reserve area. Must maintain access for future replacement.

Q: What happens if my existing septic fails?

A: Failed systems must be replaced with engineered system meeting current codes. Cannot repair or upgrade failing system without engineering. OCEHS can red-tag property until replacement completed.

Q: Do I need a geotechnical engineer too?

A: Usually not separately. Civil engineer coordinates percolation testing which provides necessary soil data. Geotechnical investigation only needed for complex sites (steep slopes, unstable soils).

Related Resources

For location-specific engineering guidance, visit our city pages for Newport Beach, Laguna Beach, Dana Point, and other South Orange County communities.

**Need septic design engineering in San Clemente? Contact AAA Engineering Design at (949) 981-4448.** Our California-licensed Civil Engineers bring deep septic system expertise, Orange County permitting knowledge, and proven results to residential septic projects throughout San Clemente and South Orange County.

Need Professional Engineering Services?

Our licensed Professional Engineers are ready to help with your project. Get a free consultation to discuss your structural engineering needs.

Related Articles

Continue exploring our engineering insights

Foundation Engineering
Dec 15
12 min read

Coastal Foundation Design in Newport Beach: Complete 2025 Guide

Expert coastal foundation design in Newport Beach. Saltwater-resistant foundations, Coastal Commission compliance, flood zone engineering. Call (949) 981-4448.

Foundation Engineering
Dec 15
10 min read

Pool Foundation Engineering in Temecula: Complete 2025 Guide

Expert pool foundation engineering in Temecula. Pool structural design, hillside pools, retaining walls, spa engineering. Call (949) 981-4448.

Commercial Engineering
Dec 15
12 min read

Office Building Structural Engineering in Los Angeles: Complete 2025 Guide

Expert office building structural engineering in Los Angeles. Commercial design, seismic engineering, tenant improvements, CBC compliance. Call (949) 981-4448.

Get Started

Ready to Start Your Project?

Get a free consultation and detailed quote for your engineering project. Our licensed Professional Engineers are ready to help bring your vision to life.

Contact Information

Office

8031 Main Street
Stanton, CA 90680

Business Hours

Monday-Friday 9:00 AM - 5:00 PM

Saturday Closed

Sunday Closed

Why Choose Us?

Free consultation & quote
24-hour response guarantee
Licensed Professional Engineers
100% satisfaction guarantee

Get Your Free Consultation

Fill out the form below and we'll get back to you within 24 hours with a detailed consultation and project quote.

We respect your privacy and never share your information. You'll receive a response within 24 hours.