DESIGNING...
We're providing dedicated support to homeowners affected by the LA wildfires.Learn More
Back to BlogStructural Engineering

Multi-Family Seismic Retrofit in Santa Monica: Soft-Story Compliance Guide 2025

Published: December 22, 2025
13 min read
By AAA Engineering Team

Updated: December 2025

*AAA Engineering Design: California PE Licensed | 20+ Years Experience | 500+ Projects | Free Consultations*

Multi-family seismic retrofit engineering provides essential structural upgrades for apartment buildings throughout Santa Monica, West Hollywood, Los Angeles, and surrounding communities facing mandatory retrofit requirements. Our licensed Professional Engineers with over 20 years of combined experience specialize in soft-story retrofit design that meets city ordinance requirements while minimizing cost and tenant disruption. Understanding Santa Monica's mandatory seismic retrofit program is essential for building owners facing compliance deadlines.

Santa Monica's soft-story ordinance targets wood-frame buildings with vulnerable first-floor conditions—typically ground-floor parking or commercial spaces with residential units above. These buildings represent significant life-safety risks in earthquakes and require structural strengthening to remain compliant.

What Is Multi-Family Seismic Retrofit Engineering?

**Direct Answer:** Multi-family seismic retrofit engineering encompasses the structural evaluation and strengthening of existing apartment buildings to meet current seismic safety standards. For soft-story buildings, this typically involves adding steel moment frames or plywood shear walls to the weak ground floor, upgrading connections throughout the structure, and improving foundation anchorage—all designed to prevent collapse during major earthquakes.

Soft-story buildings are vulnerable because:

  • **Torsional Irregularity**: Uneven wall distribution causes twisting
  • **Connection Deficiencies**: Older buildings lack modern hardware
  • **Foundation Issues**: Inadequate anchorage to foundations

Santa Monica requires mandatory retrofit for qualifying buildings, with significant penalties for non-compliance including daily fines and loss of certificate of occupancy.

What Are Santa Monica's Soft-Story Retrofit Requirements?

**Direct Answer:** Santa Monica requires owners of soft-story buildings (wood-frame, 3+ stories or 2+ stories with ground-floor parking/commercial, built before 1978) to submit retrofit plans and complete construction within mandated timeframes. The ordinance establishes a phased compliance schedule with specific deadlines for screening, engineering, permits, and completion. Non-compliance results in escalating fines and potential certificate of occupancy revocation.

Qualifying Buildings

Santa Monica's ordinance applies to buildings meeting ALL criteria:

  • Three or more stories, OR two or more stories with ground-floor parking or commercial
  • Built before January 1, 1978
  • Soft, weak, or open-front ground floor condition

Compliance Timeline

Building owners must meet phased deadlines:

  1. **Screening**: Submit structural screening report
  2. **Engineering**: Submit PE-stamped retrofit plans
  3. **Permit**: Obtain building permit for retrofit work
  4. **Completion**: Complete construction and final inspection

Penalties for Non-Compliance

  • Certificate of Occupancy revocation potential
  • Property sale complications
  • Insurance and lending issues
  • Liability exposure in future earthquakes
📞 **Facing Soft-Story Retrofit Deadline?** Our PEs design cost-effective solutions. **[Call (949) 981-4448](tel:9499814448)** | **[Request Assessment →](/contact?service=soft-story-retrofit&city=santa-monica)**

What Retrofit Engineering Services Are Available in Santa Monica?

**Direct Answer:** Santa Monica soft-story retrofit services include initial building screening, detailed structural evaluation, retrofit design with multiple cost options, PE-stamped construction documents, permit application support, and construction administration. Our engineers minimize tenant disruption and construction cost while meeting all City of Santa Monica seismic safety requirements.

Building Screening

Initial evaluation services:

  • Preliminary lateral force analysis
  • Screening report for City submission
  • Determination of retrofit requirements

Retrofit Design Options

We evaluate multiple approaches:

  • **Plywood Shear Walls**: Cost-effective where walls can be added
  • **Cantilever Column Systems**: Preserves parking configurations
  • **Combination Systems**: Optimized hybrid approaches

Construction Documents

Complete PE-stamped packages:

  • Structural framing and connection details
  • Foundation modification drawings
  • Structural calculations
  • Special inspection requirements

Permit and Construction Support

Ongoing project assistance:

  • Plan check response
  • Construction phase questions
  • Special inspection coordination
  • Final inspection support

How Much Does Soft-Story Retrofit Cost in Santa Monica?

**Direct Answer (2025 Pricing):** Soft-story retrofit engineering in Santa Monica typically ranges from $15,000 for simple buildings to $75,000+ for large or complex structures. Total construction costs (including engineering) average $60,000-$150,000 for typical 8-16 unit buildings. Costs vary significantly based on building size, existing conditions, and retrofit approach selected.

Engineering Fee Ranges

| Building Size | Units | Engineering Fee Range | |--------------|-------|----------------------| | Small | 4-8 units | $15,000-$25,000 | | Medium | 8-16 units | $25,000-$40,000 | | Large | 16-32 units | $40,000-$55,000 | | Very Large | 32+ units | $55,000-$75,000+ |

Total Project Cost Estimates

| Building Size | Total Retrofit Cost (Engineering + Construction) | |--------------|--------------------------------------------------| | Small (4-8 units) | $50,000-$100,000 | | Medium (8-16 units) | $80,000-$180,000 | | Large (16-32 units) | $150,000-$350,000 |

Cost Optimization Strategies

Our engineers work to minimize costs:

  • Optimizing number of retrofit elements
  • Minimizing foundation modifications
  • Coordinating with cost-effective contractors
  • Phasing work to reduce tenant impact

What Are Common Soft-Story Retrofit Challenges in Santa Monica?

**Direct Answer:** Common challenges include maintaining parking access during construction, minimizing tenant relocation, coordinating retrofit with building aesthetics, addressing unexpected conditions discovered during construction, and managing costs while meeting mandatory deadlines. Professional engineering addresses these through careful planning and proven retrofit strategies.

Challenge 1: Maintaining Building Operations

**Problem:** Tenants need continued access to units and parking during construction.

**Santa Monica Example:** Many buildings have limited parking that must remain partially operational during work.

**Solution:** Phased construction sequences, weekend and evening work options, and retrofit designs minimizing parking disruption.

Challenge 2: Aesthetic Integration

**Problem:** Visible steel frames may conflict with building appearance.

**Solution:** Architectural cladding options, paint finishes matching building, and strategic frame placement minimizing visibility.

Challenge 3: Budget Constraints

**Problem:** Mandatory retrofit creates unplanned capital expenditure for building owners.

**Solution:** Cost-optimized designs, contractor bidding assistance, and financing guidance including PACE programs.

What Santa Monica Building Owners Say About Our Services

"Our 12-unit building needed soft-story retrofit before the deadline. AAA Engineering designed a solution using just four steel frames that cost half what our first contractor quoted. Santa Monica approved our plans in three weeks!" — **Michael T., Santa Monica Building Owner**
"I was stressed about the retrofit mandate, but AAA made it manageable. They explained our options clearly, designed an efficient retrofit, and helped us through permitting. Our tenants barely noticed the construction." — **Sandra L., Santa Monica Property Owner**

**Our Soft-Story Track Record:**

  • 🏠 **150+ soft-story retrofits** in Santa Monica and West LA
  • ⏱️ **Average permit approval:** 2-3 weeks
  • ⭐ **4.9/5 Google rating** from building owners
  • 🔄 **100% compliance rate** with city ordinances

Contact Us

Facing a soft-story retrofit deadline in Santa Monica? Whether you need initial screening, retrofit design, or construction support, our licensed Professional Engineers are here to help you achieve compliance efficiently.

**📞 Call Now: (949) 981-4448** - Free consultation, no obligation

**Serving Santa Monica and West Los Angeles:**

  • **Santa Monica**: All neighborhoods
  • **West Hollywood**: Soft-story program
  • **Los Angeles**: Ordinance 183893 compliance
  • **Culver City**: Seismic retrofit program
  • **Beverly Hills**: Multi-family retrofit

[Get Your Free Consultation →](/contact)

---

Frequently Asked Questions

What is soft-story retrofit? Soft-story retrofit strengthens vulnerable wood-frame buildings with weak ground floors (typically parking or commercial space) by adding steel frames or shear walls to prevent collapse during earthquakes.

How much does soft-story retrofit cost in Santa Monica? Engineering fees range from $15,000 to $75,000 depending on building size. Total project costs (engineering plus construction) typically range from $50,000 to $350,000.

What is the deadline for Santa Monica soft-story compliance? Santa Monica has established phased deadlines for different building tiers. Contact us for current deadline information for your specific building.

Can tenants remain during retrofit construction? Yes, in most cases. We design retrofit approaches minimizing tenant disruption, and construction can typically proceed with tenants in place.

What happens if I don't comply with the retrofit ordinance? Non-compliance results in daily fines, potential Certificate of Occupancy revocation, and increased liability exposure. Property sales may also be complicated.

How long does the retrofit process take? From initial screening to construction completion typically takes 6-12 months, depending on building size and permit processing times.

Need Professional Engineering Services?

Our licensed Professional Engineers are ready to help with your project. Get a free consultation to discuss your structural engineering needs.

Related Articles

Continue exploring our engineering insights

Commercial Projects
Jan 15
14 min read

Data Center Structural Engineering in San Jose: Complete 2026 Guide

Data center structural engineering in San Jose. Learn about mission-critical facility design, redundant systems, and seismic requirements. Licensed CA Professional Engineers. Call (949) 981-4448.

Design & Planning
Jan 15
11 min read

MEP Engineer Near Me in Fullerton: Find Local Building Systems Experts 2026

MEP engineer near me in Fullerton. Find licensed mechanical, electrical, and plumbing engineers for commercial and residential projects. Call (949) 981-4448 for consultation.

Design & Planning
Jan 15
11 min read

Civil Engineer Near Me in Garden Grove: Find Local Site Development Experts 2026

Civil engineer near me in Garden Grove. Find licensed PE engineers for site development, grading, drainage, and permits. Call (949) 981-4448 for consultation.

Get Started

Ready to Start Your Project?

Get a free consultation and detailed quote for your engineering project. Our licensed Professional Engineers are ready to help bring your vision to life.

Contact Information

Office

8031 Main Street
Stanton, CA 90680

Business Hours

Monday-Friday 9:00 AM - 5:00 PM

Saturday Closed

Sunday Closed

Why Choose Us?

Free consultation & quote
24-hour response guarantee
Licensed Professional Engineers
100% satisfaction guarantee

Get Your Free Consultation

Complete the form and receive your consultation within 24 hours.

Personal Details

Project Details

We respect your privacy and never share your information.

Expert Online

Have a question about your project? Get a free consultation now.