Commercial tenant improvement (TI) engineering transforms raw commercial space into functional business environments throughout Stanton, Anaheim, Cypress, and Northwest Orange County. Our licensed Professional Engineers with 20+ years of combined experience—based right here in Stanton—specialize in structural modifications, MEP systems design, and code compliance for office, retail, restaurant, and industrial tenant improvements meeting California Building Code requirements.
Stanton, strategically located at the crossroads of Beach Boulevard and Katella Avenue with immediate freeway access, hosts diverse commercial developments from the Stanton Marketplace retail center to the Beach Boulevard corridor's professional offices. With our office located in Stanton, we provide unmatched local expertise and rapid response for commercial tenant improvement projects throughout the area.
What is Commercial Tenant Improvement Engineering?
Direct Answer:
Commercial tenant improvement engineering encompasses the design and modification of existing commercial spaces to meet new tenant needs, including structural modifications (removing walls, adding beams), MEP systems design (HVAC, electrical, plumbing), accessibility compliance (ADA upgrades), life safety systems (fire sprinklers, egress), and code compliance documentation. Licensed California engineers prepare stamped construction documents required for building permits when TI work involves structural changes, mechanical/electrical systems, plumbing modifications, or accessibility upgrades.
California requires professional engineering for most significant tenant improvements including structural modifications affecting building integrity, electrical service over 200 amps, mechanical systems over 10 tons, commercial kitchen installations, ADA compliance retrofits, and any work triggering substantial remodel thresholds. Our commercial engineering services based in Stanton provide complete TI engineering for all project types.
What Types of Tenant Improvements Require Engineering in Stanton?
Direct Answer:
Stanton tenant improvements requiring engineering include office buildouts with demising walls and open layouts, retail spaces with structural modifications, restaurants with full MEP systems and commercial kitchens, medical/dental offices with specialized systems, fitness centers with structural reinforcement needs, industrial spaces with equipment platforms, and any TI involving structural changes, significant mechanical/electrical work, or ADA upgrades. Most commercial lease agreements require engineered plans for permit approval.
Office Tenant Improvements
Professional Office Buildouts
Common along Beach Boulevard and in business parks:
**Typical Engineering Requirements:**
- Demising wall design (separation between tenants)
- Open office layout with minimal partitions
- Conference room and private office framing
- Electrical design for workstations and equipment
- HVAC modifications for new layout
- Data/communications infrastructure
- ADA compliance (restrooms, access, routes)
**Stanton Office Characteristics:**
- Spaces typically 1,500-5,000 square feet
- Existing building shell construction (1970s-2000s)
- Shared building systems requiring coordination
- Landlord work letter defining base building vs. tenant scope
Retail Tenant Improvements
Storefront and Retail Spaces
Stanton Marketplace and Beach Boulevard retail:
**Engineering Considerations:**
- Storefront modifications and entrances
- Open sales floor with minimal obstructions
- Back-of-house areas (storage, restrooms, break rooms)
- Display lighting and electrical outlets
- HVAC zoning for customer comfort
- Accessibility compliance (entries, restrooms, aisles)
- Structural evaluation for wall removals
**Specialty Retail:**
- Salons/spas: Plumbing for shampoo bowls, sinks
- Fitness studios: Floor loading for equipment
- Cannabis dispensaries: Security and ventilation requirements
- Auto-related: High electrical loads, ventilation
Learn about retail engineering requirements.
Restaurant & Food Service
Full-Service Restaurant TI
Most complex tenant improvements due to kitchen requirements:
**Structural Engineering:**
- Floor loading evaluation for kitchen equipment
- Roof penetrations for exhaust hoods
- Structural support for walk-in coolers/freezers
- Reinforcement for heavy equipment
**MEP Engineering:**
- Commercial kitchen electrical (high amperage)
- Gas line sizing for cooking equipment
- Grease interceptor and plumbing systems
- Type I hood exhaust systems
- Make-up air units (required for exhaust)
- Commercial refrigeration
- Dining area HVAC separate from kitchen
**Code Requirements:**
- Health department plan review
- Fire suppression in hood systems
- Grease duct construction
- Emergency shut-offs
- ADA restroom compliance
Medical & Dental Offices
Healthcare Tenant Improvements
Specialized requirements for medical use:
- Additional plumbing for exam rooms
- HVAC with proper ventilation rates
- Medical equipment electrical loads
- Specialized lighting for exam/procedure rooms
- ADA compliance (particularly restrooms and access)
- Privacy considerations (HIPAA)
How Does the TI Engineering Process Work in Stanton?
Direct Answer:
The commercial tenant improvement engineering process in Stanton typically takes 4-8 weeks from project kickoff to permit-ready plans. The process includes existing building assessment, tenant program review and space planning support, structural evaluation for proposed modifications, MEP systems design coordinated with landlord's base building, code compliance analysis including ADA requirements, and plan preparation with engineering stamps. Our Stanton-based team provides rapid site visits and efficient coordination with building owners and property managers.
Phase 1: Project Assessment & Programming (Week 1-2)
Existing Building Evaluation:
Our Stanton engineers assess:
- Existing MEP systems and capacity
- Current electrical and gas service sizes
- HVAC system type and capacity
- Plumbing risers and available connections
- Fire sprinkler system and coverage
- ADA compliance status of common areas
Stanton-Specific Factors:
As a Stanton-based firm, we have extensive knowledge of:
- Local commercial building stock and construction types
- Beach Boulevard corridor buildings (1960s-1990s construction)
- Stanton Marketplace and newer retail centers
- Industrial park buildings in eastern Stanton
- City of Stanton plan check procedures and timelines
- Local building inspectors' preferences
Tenant Program Analysis:
- Business operational requirements
- Equipment needs and specifications
- Utility service requirements
- Budget constraints and value engineering
- Schedule requirements and phasing
Phase 2: Engineering Design (Weeks 2-6)
Structural Engineering:
**Existing Structure Evaluation:**
- Review original building plans (if available)
- Field verification of structural elements
- Load capacity analysis for modifications
- Seismic considerations for alterations
**Typical Structural TI Work:**
- Removing non-bearing partitions (verification)
- Adding demising walls and partitions
- Door and window opening modifications
- Reinforcing for new concentrated loads
- Roof penetrations for HVAC and exhaust
- Seismic bracing for suspended equipment
MEP Engineering:
**Electrical Design:**
- Tenant electrical load calculations
- Service size determination (tenant panel)
- Power distribution plan
- Lighting design (Title 24 and Title 20 compliance)
- Emergency and exit lighting
- Data/communications infrastructure
- Equipment circuits (HVAC, kitchen, etc.)
**Mechanical Design:**
- HVAC load calculations for tenant space
- VAV box sizing (if central system)
- Split system design (if tenant-provided)
- Ductwork layout and sizing
- Thermostat locations and zones
- Kitchen exhaust and make-up air (restaurants)
- Ventilation for code compliance
**Plumbing Design:**
- Fixture layout and connections
- Domestic water sizing
- Drainage and vent systems
- Water heater (if tenant-provided)
- Gas lines (restaurants, some retail)
- Grease interceptor (food service)
- Backflow prevention devices
Phase 3: Code Compliance & Permitting (Weeks 6-8)
Code Analysis:
California commercial TI projects must address:
- **Accessibility (ADA/CBC Chapter 11B):** Accessible route, restrooms, parking, entries
- **Energy Compliance (Title 24):** Lighting power density, HVAC efficiency, controls
- **Fire/Life Safety:** Sprinkler coverage, fire alarm, exit signs, emergency lighting
- **Health Department (food service):** Kitchen layout, equipment, ventilation, finishes
Substantial Alteration Triggers:
If TI exceeds certain thresholds, additional upgrades required:
- Valuation > $177,828 (2025 threshold, adjusted annually)
- Area > 50% of building
- Triggers accessibility path of travel upgrades (20% of project cost)
Stanton Building Department Process:
- Plan check corrections: 1-2 weeks
- Re-submittal review: 1-2 weeks
- Permit issuance: 1 week
- Total timeline: 4-8 weeks from submittal
Required Documents:
- Structural plans (if modifications)
- MEP plans (electrical, mechanical, plumbing)
- Title 24 compliance calculations
- Fire sprinkler plans (if modifications)
- Fire alarm plans (if required)
- Equipment specifications and cut sheets
How Much Does TI Engineering Cost in Stanton?
Direct Answer (2025 Pricing):
Commercial tenant improvement engineering in Stanton costs $5,000-$20,000 for most projects depending on size and complexity. Small office TI (1,000-2,500 sq ft) ranges $5,000-$8,000, medium retail/office (2,500-5,000 sq ft) costs $8,000-$12,000, restaurant TI runs $12,000-$20,000, and large or complex projects cost $15,000-$30,000+. Pricing includes structural evaluation, MEP systems design, Title 24 compliance, and engineering stamps. Projects requiring extensive structural modifications may cost 30-50% more.
Engineering Pricing by Project Type
Office Tenant Improvements:
- Medium office (2,500-5,000 sq ft): $8,000-$12,000
- Large office (5,000-10,000 sq ft): $12,000-$18,000
- Call center or specialized: $15,000-$25,000
Retail Tenant Improvements:
- Salon/spa (plumbing-intensive): $10,000-$15,000
- Fitness studio: $12,000-$18,000
- Specialty retail (high electrical): $10,000-$16,000
Restaurant Tenant Improvements:
- Full-service restaurant: $16,000-$25,000
- Full bar + kitchen: $20,000-$30,000
- High-end or complex: $25,000-$40,000
Medical/Dental Offices:
- Dental office: $12,000-$18,000
- Surgical center: $20,000-$35,000+
Factors Affecting Engineering Costs
Project Complexity:
- Extent of MEP system changes
- Commercial kitchen design
- Medical gas systems
- High electrical loads
- Extensive plumbing work
- Fire sprinkler modifications
Building Conditions:
- Available building documentation
- Capacity of existing systems
- Code compliance of base building
- ADA upgrade requirements
Schedule Requirements:
- Phased construction: +15-25% fee
- After-hours inspections: Additional coordination costs
Why Choose AAA Engineering Design for Stanton Tenant Improvements?
Direct Answer:
AAA Engineering Design provides complete commercial TI engineering from our Stanton office with 20+ years of California project experience. Our local presence enables rapid site visits, immediate landlord coordination, and deep familiarity with Stanton commercial buildings and city permitting procedures. We've completed 150+ commercial TI projects in Orange County including 40+ in Stanton and immediately surrounding cities. Comprehensive MEP and structural capabilities, competitive pricing ($5,000-$20,000 for most projects), and efficient permit processing deliver successful tenant improvement outcomes.
Stanton-Based Advantage
Local Expertise You Can't Match:
- **40+ Stanton TI Projects** - Extensive experience with local buildings
- **City Relationships** - Familiarity with Stanton Building Department staff and procedures
- **5-Minute Response** - Quick site visits for existing condition verification
- **Local Building Knowledge** - Understanding of Stanton's commercial building stock by area and era
**Areas We Know Best:**
- Beach Boulevard corridor (office and retail)
- Katella Avenue commercial (auto-related, retail)
- Stanton Marketplace area (retail centers)
- Industrial areas (eastern Stanton near city limits)
- All surrounding cities (Anaheim, Cypress, Garden Grove, Westminster)
Comprehensive TI Engineering Services
One-Stop Engineering:
- Mechanical systems design (HVAC)
- Electrical power and lighting
- Plumbing and gas line design
- Title 24 energy compliance
- ADA accessibility compliance
- Fire sprinkler coordination
- Permit submittal and plan check support
Integrated Approach:
- Landlord engineer coordination
- Base building systems evaluation
- Contractor coordination during construction
- Building department interaction
- Inspection support
Proven Track Record
Project Experience:
- Retail TI: 40+ projects (various retail types and sizes)
- Restaurant TI: 25+ projects (fast casual to fine dining)
- Industrial TI: 30+ projects (warehouse conversions, manufacturing)
- Medical TI: 20+ projects (dental, medical, urgent care)
Client Types:
- Local business owners
- Property management companies
- Commercial landlords
- Design-build contractors
- Tenant representation brokers
Efficient, Cost-Effective Process
Our TI Engineering Workflow:
1. **Rapid Initial Assessment** - Same-day site visit possible for Stanton projects 2. **Comprehensive Proposal** - Detailed scope and fee within 48 hours 3. **Efficient Design** - Streamlined process minimizing tenant downtime 4. **Permit-Ready Documents** - First-time approval rate over 90% 5. **Construction Support** - Available for contractor questions and inspections
Value Engineering:
- Creative approaches to existing building constraints
- Phasing strategies to maintain business operations
- Code compliance alternatives when applicable
**Contact:** (949) 981-4448 **Visit Us:** Stanton, CA 90680 (serving all of Orange County) **Serving:** Stanton, Anaheim, Cypress, Garden Grove, Westminster, Buena Park, and all 34 Orange County cities
---
Need Commercial TI Engineering?
Work with Stanton's local engineering experts for your tenant improvement project.
Schedule Consultation | Call (949) 981-4448