California Building Code (CBC) 2025, effective January 1, 2025, establishes the current structural requirements for all construction in California. The code incorporates ASCE 7-22 for load design, updated seismic maps with higher spectral accelerations for many California sites, and revised provisions for wood, steel, concrete, and masonry construction. Building owners, developers, and contractors must ensure full CBC 2025 compliance for all permits issued in 2026.
*Updated: February 2026*
California's building code is the most comprehensive and stringent in the United States, reflecting the state's unique seismic hazard, fire risk, and environmental conditions. The CBC 2025 code cycle brought significant structural engineering changes that affect every type of construction project across the state. From residential additions to high-rise commercial towers, understanding these requirements is essential for successful project delivery.
At AAA Engineering & Design, our licensed Professional Engineers have navigated California's building code requirements for over 20 years, completing more than 500 structural engineering projects. This guide provides a thorough overview of the current structural requirements that California property owners, developers, architects, and contractors need to understand in 2026.
---
What Is the California Building Code?
The California Building Code (CBC) is Title 24, Part 2 of the California Code of Regulations. It is the state's adopted version of the International Building Code (IBC), modified with California-specific amendments that address the state's unique hazards and construction practices. The CBC is updated on a three-year cycle, with the current edition (CBC 2025) based on the 2024 IBC.
The CBC governs:
- **Building materials** including wood, steel, concrete, masonry, and aluminum
- **Fire and life safety** including fire-resistant construction, means of egress, and fire protection systems
- **Accessibility** per California's enhanced accessibility requirements
- **Existing buildings** through the California Existing Building Code (CEBC)
For structural engineering purposes, the CBC incorporates by reference:
- ACI 318-19: Building Code Requirements for Structural Concrete
- AISC 360-22: Specification for Structural Steel Buildings
- AWC NDS-2024: National Design Specification for Wood Construction
- TMS 402/602-22: Building Code Requirements for Masonry Structures
Visit our structural engineering services page for professional code compliance assistance.
---
Key Changes in CBC 2025 Affecting Structural Design
Updated Seismic Design Maps
The CBC 2025 adoption of ASCE 7-22 introduced updated seismic hazard maps that significantly affect structural design across California:
**Higher spectral accelerations:** Many California sites experience increased design spectral accelerations compared to the previous code cycle. Sites near the San Andreas Fault, Hayward Fault, and Southern California fault systems see increases of 10-30% in design seismic forces.
**Multi-period design spectrum:** ASCE 7-22 introduces a multi-period design spectrum that replaces the two-period approximation used in previous editions. This change affects the seismic design of buildings with periods between 1.0 and 10.0 seconds, particularly mid-rise and tall buildings.
**Site-specific ground motion procedures:** Updated requirements for site-specific seismic hazard analysis affect projects on soft soil sites, near-fault locations, and buildings over 160 feet in height.
Revised Wind Load Provisions
ASCE 7-22 wind load provisions bring several changes relevant to California construction:
- Modified exposure category determination procedures
- Revised component and cladding pressure coefficients affecting wall and roof design
- Updated provisions for topographic wind speed-up effects relevant to California hillside construction
Wood Construction Updates
CBC 2025 incorporates updated wood design standards that affect residential and light commercial construction:
- Updated shear wall design provisions including new aspect ratio requirements
- Modified diaphragm design procedures for wood-frame buildings
- New provisions for cross-laminated timber (CLT) construction
Concrete and Masonry Changes
- Revised requirements for concrete moment frame detailing
- Modified masonry shear wall prescriptive requirements
- New provisions for post-installed concrete anchors
---
Structural Load Requirements Under CBC 2025
Dead Loads
Dead loads represent the permanent weight of the building components. CBC 2025 requires accurate dead load calculation for all structural elements:
| Building Component | Typical Dead Load (psf) | |-------------------|------------------------| | Wood-frame floor (with finish) | 12-18 | | Wood-frame roof (with roofing) | 10-15 | | Concrete slab (per inch thickness) | 12.5 | | Steel deck with concrete fill | 35-50 | | Stucco exterior (7/8") | 10 | | Drywall (5/8") | 3 | | Tile roofing | 10-16 | | Solar panels | 3-5 |
Live Loads (ASCE 7-22 Table 4.3-1)
Live loads represent occupancy and use loads. Key California live load requirements:
| Occupancy | Minimum Live Load (psf) | |-----------|------------------------| | Residential (private rooms) | 40 | | Residential (public areas) | 100 | | Office | 50 | | Retail (first floor) | 100 | | Retail (upper floors) | 75 | | Light storage | 125 | | Heavy storage | 250 | | Assembly (fixed seats) | 60 | | Assembly (movable seats) | 100 | | Balconies | 60 (min) | | Decks | 40 | | Garages (passenger) | 40 | | Roofs (ordinary) | 20 |
Seismic Load Requirements
The seismic design process under CBC 2025 follows ASCE 7-22 Chapter 12:
**Step 1: Determine seismic parameters**
- Site-specific Ss and S1 values from ASCE 7-22 seismic hazard maps
- Site Class determination (A through F) from geotechnical data
- Design spectral accelerations SDS and SD1
- Seismic Design Category (A through F)
**Step 2: Select structural system**
- Special or ordinary lateral force-resisting system based on SDC
- Response modification coefficient (R) for the selected system
- Deflection amplification factor (Cd) for drift calculations
- System overstrength factor (Omega-0) for connection design
**Step 3: Calculate seismic base shear**
- Equivalent lateral force procedure per ASCE 7-22 Section 12.8
- Or modal response spectrum analysis per Section 12.9
- Or seismic response history procedures per Chapter 16
**Step 4: Distribute forces and design members**
- Vertical distribution of seismic forces to each floor level
- Horizontal distribution to lateral elements considering accidental torsion
- Design of shear walls, moment frames, or braced frames
- Design of diaphragms and collectors
- Foundation design for seismic overturning and sliding
Wind Load Requirements
California wind load design per ASCE 7-22 Chapter 26-31:
| California Region | Basic Wind Speed (mph) | Risk Category II | |-------------------|----------------------|------------------| | Coastal (LA, SD, SF) | 110 | Standard | | Inland Valleys | 95-110 | Standard | | Desert (Palm Springs, Mojave) | 110-120 | Elevated | | Mountain Passes | 110-130 | Elevated | | Special Wind Regions | Up to 150+ | Per local data |
For information about seismic retrofitting to bring existing buildings into CBC 2025 compliance, visit our seismic services page.
---
California-Specific Code Amendments
California Amendments to IBC
The CBC includes over 200 California-specific amendments to the base IBC. Key structural amendments include:
**Seismic requirements:** California imposes seismic design requirements on all buildings regardless of Seismic Design Category, unlike the base IBC which relaxes requirements in low-seismic regions.
**Hospital and essential facility standards:** OSHPD (now HCAI) requirements for hospitals exceed base IBC standards significantly, with seismic performance objectives approaching immediate occupancy after design-level earthquakes.
**School construction:** DSA (Division of the State Architect) oversees public school construction with structural requirements exceeding standard CBC provisions for commercial buildings.
**Wildfire-Urban Interface:** CBC Chapter 7A requires fire-resistant construction materials and methods in designated WUI zones, affecting structural material selection and detailing.
Local Jurisdiction Amendments
California law allows local jurisdictions to adopt amendments that exceed (but not reduce) CBC requirements. Notable examples:
**City of Los Angeles:** LABC includes enhanced seismic provisions for tall buildings, mandatory seismic instrumentation, and specific concrete and steel construction requirements beyond CBC standards.
**City of San Francisco:** SFBC includes enhanced seismic requirements for existing buildings, mandatory soft-story retrofit programs, and specific requirements for buildings on fill soils.
**City of Long Beach:** Enhanced concrete construction requirements based on the city's independent building department authority.
---
Code Compliance for Different Building Types
Residential Construction
California residential construction follows either the CBC or the California Residential Code (CRC), depending on building configuration:
**CRC-eligible structures:** One- and two-family dwellings and townhouses up to three stories can use prescriptive provisions of the CRC for conventional wood-frame construction. However, many California sites exceed the limitations of prescriptive design due to seismic parameters, requiring engineered structural design per CBC provisions.
**CBC-required structures:** Multi-family residential buildings, residential structures over three stories, and buildings using non-prescriptive structural systems require full CBC compliance with engineered structural plans.
For residential structural engineering services, visit our residential services page.
Commercial Construction
All commercial buildings in California require CBC compliance with engineered structural plans stamped by a licensed PE or SE. Key compliance areas include:
- Seismic design per the building's SDC and selected lateral system
- Fire-resistance-rated construction per CBC Chapter 6
- Accessibility compliance per CBC Chapter 11A
- Special inspection programs per CBC Chapter 17
For commercial structural engineering services, explore our commercial offerings.
Industrial Construction
California industrial buildings face unique code compliance requirements:
- Crane load design for buildings with overhead cranes
- Equipment anchorage design per ASCE 7-22 Chapter 13
- Hazardous materials storage requirements affecting structural design
- Concrete tilt-up construction per CBC Section 1901.2 with California amendments
ADU Construction
Accessory dwelling units follow specific California code provisions:
- Reduced setback and lot coverage standards
- Streamlined permitting processes
- Full structural code compliance requirements per CBC or CRC
Learn about ADU engineering services and specific structural requirements.
---
Special Inspection Requirements Under CBC 2025
CBC Chapter 17: Special Inspections and Tests
CBC 2025 Chapter 17 requires special inspections for structural elements whose proper installation is critical to building safety:
| Structural Element | Special Inspection Required | |-------------------|---------------------------| | Concrete placement | Continuous during placement | | Reinforcing steel | Periodic before concrete pour | | Structural steel welding | Continuous for complete penetration welds | | High-strength bolting | Periodic during installation | | Wood shear wall nailing | Periodic during nailing | | Masonry construction | Continuous or periodic per design | | Post-installed anchors | Continuous during installation | | Soil compaction | Continuous during fill placement | | Deep foundations | Continuous during installation | | Shotcrete application | Continuous during placement |
Statement of Special Inspections
Every California project requiring special inspections must include a Statement of Special Inspections prepared by the structural engineer. This document identifies:
- All structural elements requiring special inspection
- The type of inspection (continuous or periodic) for each element
- The applicable code section and standard for each inspection
- Required material testing and frequency
- The responsible special inspection agency
Structural Observation Requirements
In addition to special inspections, CBC 2025 Section 1704.6 requires structural observation for buildings in Seismic Design Categories D, E, and F -- which includes virtually all of California. Structural observation involves periodic site visits by the structural engineer of record (or their designee) to verify that construction generally conforms to the approved structural plans. The structural engineer provides written reports documenting each observation visit, noting any conditions that do not appear to conform to the design documents and requiring corrective action before construction proceeds. Structural observation is not a substitute for special inspections; both are required concurrently for California projects in high seismic design categories.
---
Code Compliance Process and Timeline
Typical Code Compliance Workflow in California
- **Project scope definition** -- Determine the building type, size, occupancy, and location
- **Site investigation** -- Geotechnical report, site survey, and existing building assessment (if applicable)
- **Structural design** -- Engineering analysis and design per CBC 2025 and referenced standards
- **Plan preparation** -- Structural drawings and calculation package with PE stamp
- **Plan check submittal** -- Submit to the local building department or state agency
- **Plan check review** -- Building department review for code compliance (2-12 weeks)
- **Plan check corrections** -- Address any reviewer comments and resubmit
- **Permit issuance** -- Building permit issued for construction
- **Construction inspections** -- Building department and special inspections during construction
- **Certificate of Occupancy** -- Issued upon passing all final inspections
Plan Check Timelines by Jurisdiction
| Jurisdiction | Typical Plan Check Time | Expedited Option | |-------------|------------------------|-----------------| | Los Angeles (LADBS) | 4-8 weeks | Yes (express plan check) | | Orange County cities | 2-4 weeks | Varies by city | | San Diego (DSD) | 4-6 weeks | Yes (fast track) | | Riverside County | 3-5 weeks | Limited | | San Bernardino County | 3-5 weeks | Limited | | State agencies (HCAI, DSA) | 8-16 weeks | Limited |
---
Cost of Building Code Compliance Engineering
| Project Type | Typical Engineering Cost | Factors | |-------------|------------------------|---------| | Residential addition | $2,000-$6,000 | Size, complexity | | ADU (detached) | $4,000-$10,000 | Size, foundation type | | Commercial tenant improvement | $3,000-$8,000 | Scope of structural work | | New commercial building | $15,000-$50,000+ | Size, height, complexity | | Seismic retrofit | $10,000-$100,000+ | Building type, scope | | Industrial building | $10,000-$40,000 | Size, equipment loads | | Code compliance review | $2,000-$5,000 | Building size, code issues |
---
Client Experiences with California Code Compliance
---
Why Choose AAA Engineering & Design for California Code Compliance
20+ Years of California Code Experience
Our firm has practiced structural engineering in California for over two decades, navigating multiple code cycles from CBC 2001 through CBC 2025. This depth of experience ensures we understand both current requirements and the historical context that affects existing building evaluations.
500+ Completed Projects
We have completed over 500 structural engineering projects across California, spanning residential, commercial, industrial, and institutional building types. This breadth of experience means we have encountered and resolved virtually every code compliance challenge California construction presents.
Licensed Professional Engineers
All structural work is performed and stamped by California-licensed Professional Engineers who maintain current knowledge of CBC requirements through continuing education and active participation in engineering professional organizations.
Multi-Jurisdiction Experience
We work across all California jurisdictions, understanding the specific plan check requirements, amendment preferences, and reviewer expectations of each building department. This knowledge translates to faster approvals and fewer corrections.
Cost-Effective Compliance Solutions
We design structural solutions that achieve full code compliance at the lowest reasonable cost. For existing buildings, we leverage CEBC provisions that allow practical and economical compliance approaches.
Explore our comprehensive structural engineering services guide for additional information about our capabilities.
---
Frequently Asked Questions
What is the current California Building Code edition for 2026?
The California Building Code 2025 (CBC 2025) is the current edition, effective January 1, 2025, and governing all construction permits issued through December 31, 2028. The CBC 2025 is based on the 2024 International Building Code with extensive California-specific amendments. All structural design in California must comply with CBC 2025 for permits issued in 2026.
How does CBC 2025 differ from the previous edition?
CBC 2025 incorporates ASCE 7-22 with updated seismic hazard maps that increase design forces for many California sites. The code includes revised wind load provisions, updated wood construction standards per NDS-2024, enhanced concrete design requirements per ACI 318-19, and new provisions for mass timber construction. The multi-period seismic design spectrum is the most technically significant change affecting structural design.
Do I need a structural engineer for building code compliance in California?
Yes, for most projects. California requires PE-stamped structural plans for all commercial buildings, multi-family residential buildings, buildings over one story with certain structural systems, and any building where prescriptive code provisions do not apply. Even projects that theoretically qualify for prescriptive design often require engineered structural plans due to California's high seismic parameters exceeding prescriptive limitations.
What happens if my building does not comply with current code?
Existing buildings are not automatically required to comply with current code unless specific triggers occur: change of occupancy, additions exceeding threshold percentages of existing area, substantial structural alterations, or mandatory retrofit ordinance requirements. When triggered, compliance follows the California Existing Building Code (CEBC), which provides proportional compliance requirements based on the scope of work.
How often does the California Building Code change?
The CBC operates on a three-year update cycle. The current CBC 2025 replaced CBC 2022 on January 1, 2025. The next edition (CBC 2028) takes effect January 1, 2028. Projects permitted under one code edition are generally allowed to complete construction under that edition, even if a new code takes effect during construction.
What are the penalties for building code non-compliance in California?
California building code non-compliance can result in stop-work orders, permit revocation, required demolition of non-compliant work, fines from the local building department, liability for any resulting injuries or damages, and inability to sell or refinance the property. In serious cases, building code violations can constitute criminal misdemeanors under California Health and Safety Code.
---
- Structural Engineering Services Guide -- Comprehensive overview of structural engineering services
- Commercial & Industrial Structural Engineering Guide -- Guide to commercial building structural engineering
---
Need California Building Code Compliance Assistance?
Our licensed Professional Engineers provide code compliance evaluations, structural design, and plan check support for all building types across California. Contact us today for a consultation.