DESIGNING...
We're providing dedicated support to homeowners affected by the LA wildfires.Learn More
Back to BlogCommercial Engineering

Apartment Building Structural Engineer in West Hollywood: Multi-Family Design 2026

Published: February 2, 2026
14 min read
By AAA Engineering Team

Updated: February 2026

West Hollywood's dense urban environment and housing demand make multi-family residential development essential to the community's growth. From new apartment construction to mandatory seismic retrofits of existing buildings, apartment building structural engineering plays a critical role in providing safe, code-compliant housing for WeHo residents.

This comprehensive guide is part of our Commercial & Industrial Structural Engineering Guide and covers everything property owners, developers, and architects need to know about apartment building structural engineering in West Hollywood.

What Is Apartment Building Structural Engineering?

Apartment building structural engineering encompasses the design of multi-family residential structures from foundations to roofs. This specialized discipline addresses:

  • **Lateral force resistance** for seismic and wind loads
  • **Foundation design** appropriate to soil conditions
  • **Floor vibration control** for occupant comfort
  • **Sound transmission** considerations between units
  • **Fire resistance** requirements per building codes

In West Hollywood, apartment buildings must comply with:

  1. **California Building Code (CBC) 2025** - Structural requirements
  2. **West Hollywood Municipal Code** - Local amendments
  3. **West Hollywood Soft-Story Ordinance** - Mandatory retrofit requirements
  4. **ASCE 7-22** - Seismic and wind design loads
  5. **ACI 318-19** - Concrete design (if applicable)
  6. **NDS-2024** - Wood design (if applicable)

**West Hollywood Building Department Contact:**

  • Phone: (323) 848-6370
  • Address: 8300 Santa Monica Boulevard, West Hollywood, CA 90069
  • Plan Check Turnaround: 4-6 weeks for multi-family projects

What Is West Hollywood's Soft-Story Retrofit Requirement?

Mandatory Retrofit Ordinance West Hollywood's soft-story ordinance requires seismic retrofits for:

  • Wood-frame construction
  • Ground floor parking or commercial space
  • Buildings built before January 1, 1978

**Timeline Requirements:**

  • Building inventory notification: Completed
  • Engineering evaluation: Completed
  • Permit application: Deadlines vary by tier
  • Construction completion: Per permit schedule

What Creates a Soft Story? A soft story exists when one level (usually ground floor) is significantly weaker or more flexible than levels above. Common causes include:

  • **Large openings** - Commercial storefronts below residential
  • **Insufficient shear walls** - Open floor plans at ground level
  • **Discontinuous walls** - Walls above not continuing to foundation

Retrofit Solutions AAA Engineering designs soft-story retrofits using:

  • **Cantilevered column systems** - Per FEMA P-807 guidelines
  • **Plywood shear walls** - Where openings can be reduced
  • **Steel braced frames** - For maximum stiffness

Retrofit Engineering Costs

| Building Size | Retrofit Engineering | Typical Construction | |--------------|---------------------|---------------------| | 6-12 units | $15,000-$25,000 | $100,000-$200,000 | | 12-24 units | $25,000-$40,000 | $200,000-$400,000 | | 24-50 units | $40,000-$60,000 | $400,000-$750,000 | | 50+ units | $60,000-$85,000+ | $750,000-$1.5M+ |

What Types of Apartment Projects Does AAA Engineering Design?

New Construction Ground-up multi-family development:

  • **Type V wood frame** - Up to 5 stories with fire-resistive assemblies
  • **Type III wood frame** - Exterior non-combustible walls
  • **Affordable housing** - Density bonus and streamlined approvals

Additions and Alterations Modifications to existing buildings:

  • **Horizontal additions** - Expanding building footprint
  • **Unit conversions** - Garage conversions, ADUs
  • **Major remodels** - Structural modifications and upgrades

Seismic Retrofits Strengthening existing buildings:

  • **Non-ductile concrete retrofits** - For older concrete buildings
  • **Unreinforced masonry retrofits** - Brick building upgrades
  • **Voluntary upgrades** - Beyond code minimum

Accessory Dwelling Units (ADUs) ADU integration with apartments:

  • **Detached ADUs** - New construction on apartment properties
  • **Junior ADUs** - Within existing living space
  • **Multi-ADU projects** - SB 9 lot splits

What Is the Apartment Building Engineering Process?

Phase 1: Project Assessment (1-2 Weeks) Initial engineering evaluation:

  1. **Site and building review** - Existing conditions assessment
  2. **Code analysis** - Applicable requirements
  3. **Geotechnical review** - Soil conditions and recommendations
  4. **Preliminary concepts** - Structural system options
  5. **Fee proposal** - Detailed scope and pricing

Phase 2: Structural Design (4-8 Weeks) Comprehensive engineering:

**Gravity System:**

  • Floor framing design
  • Roof framing design
  • Load-bearing wall analysis
  • Header and beam sizing
  • Column and post design

**Lateral System:**

  • Seismic analysis per ASCE 7-22
  • Wind analysis
  • Shear wall design
  • Diaphragm design
  • Connection design

**Foundation System:**

  • Spread footings or continuous footings
  • Grade beams if required
  • Slab-on-grade design
  • Retaining walls if applicable

Phase 3: Construction Documents (3-4 Weeks) PE-stamped drawings including:

  • Floor and roof framing plans
  • Shear wall schedules and locations
  • Structural details and sections
  • Specifications and general notes

Phase 4: Plan Check (4-6 Weeks) West Hollywood permit process:

  • Plan check review
  • Response to comments
  • Permit issuance

Phase 5: Construction Services Project duration support:

  • RFI responses
  • Site observations
  • Special inspection coordination

How Much Does Apartment Building Engineering Cost in West Hollywood?

Engineering Fee Ranges by Project Type

| Project Type | Typical Fee Range | Timeline | |-------------|------------------|----------| | Soft-Story Retrofit (10 units) | $20,000-$35,000 | 8-12 weeks | | New 5-10 Unit Building | $40,000-$60,000 | 12-16 weeks | | New 10-20 Unit Building | $60,000-$90,000 | 14-18 weeks | | New 20-50 Unit Building | $90,000-$125,000 | 16-22 weeks | | Podium Building (50+ units) | $125,000-$150,000+ | 20-28 weeks |

Cost Factors Engineering fees in West Hollywood depend on:

  1. **Building complexity** - Irregular geometry, setbacks, cantilevers
  2. **Construction type** - Wood frame vs. concrete podium
  3. **Soil conditions** - Special foundations if required
  4. **Seismic requirements** - Retrofit vs. new construction
  5. **Schedule requirements** - Rush fees for expedited service

Construction Cost Context Apartment construction in West Hollywood typically costs:

| Construction Type | Cost per Unit | Notes | |------------------|---------------|-------| | Soft-Story Retrofit | $15,000-$30,000 | Per affected unit | | Type V Wood Frame | $350,000-$450,000 | Per unit, new construction | | Podium Building | $450,000-$550,000 | Per unit, parking included | | Affordable Housing | $400,000-$500,000 | Per unit, with subsidies |

*Note: West Hollywood construction costs are among the highest in Southern California*

What Design Challenges Exist in West Hollywood?

Limited Lot Sizes West Hollywood's urban density creates:

  • Zero lot line construction with fire separation
  • Limited construction staging areas
  • Vertical construction emphasis

Height and Density Limits Zoning constraints include:

  • Floor area ratio (FAR) maximums
  • Setback requirements
  • Parking requirements (or reductions per transit proximity)

Historic Building Considerations West Hollywood has many older buildings:

  • Compatibility with adjacent historic structures
  • Adaptive reuse opportunities
  • Preservation of significant architectural features

Neighbor Relations Urban construction challenges:

  • Shoring for adjacent buildings
  • Party wall considerations
  • Access for construction equipment

Why Choose AAA Engineering Design for West Hollywood Apartments?

Our Qualifications

**Experience:** 200+ apartment projects in Los Angeles County **Specialty:** Soft-story retrofits and multi-family new construction **Local Knowledge:** Extensive West Hollywood Building Department experience **Response Time:** 48-hour turnaround on urgent requests

Our Services

  1. **Soft-Story Evaluations** - Determining retrofit requirements
  2. **Retrofit Design** - Engineering solutions for compliance
  3. **New Construction** - Ground-up structural design
  4. **Construction Administration** - Support through completion

Recent West Hollywood Area Projects

  • Soft-story retrofit for 24-unit building on Fountain Avenue
  • Mixed-use development with 30 units in adjacent Los Angeles
  • Historic building adaptive reuse in Fairfax District

Client Testimonials

"AAA Engineering's soft-story retrofit expertise saved us significant money. They found the most efficient structural solution that preserved our parking spaces while meeting all requirements." - *Daniel R., Property Owner, West Hollywood*
"Their experience with West Hollywood Building Department made our permitting process smooth. They knew exactly what the plan checkers would look for." - *Christine L., Developer, Los Angeles*

How Do You Get Started with AAA Engineering Design?

Free Consultation Contact us to discuss your West Hollywood apartment project:

  • Preliminary assessment of structural approach
  • Fee and schedule estimate
  • Soft-story compliance evaluation (if applicable)

Information to Prepare For an efficient consultation, gather:

  • Existing building plans (if available)
  • Soft-story notification letters (if received)
  • Preliminary architectural drawings (for new construction)

Contact Information

**AAA Engineering Design**

  • Phone: (949) 981-4448
  • Email: info@aaaengineeringdesign.com
  • Website: aaaengineeringdesign.com
  • Service Area: West Hollywood and all of Southern California

---

Frequently Asked Questions

What is the deadline for West Hollywood soft-story retrofits? West Hollywood has a tiered deadline system based on building size and risk category. Contact the Building Department for your specific building's deadline. AAA Engineering can help you understand your timeline and begin the engineering process immediately.

How long does soft-story retrofit engineering take? Typical soft-story retrofit engineering takes 8-12 weeks from contract to permit-ready drawings. Add 4-6 weeks for West Hollywood plan check. Construction typically takes 3-6 months depending on building size and retrofit complexity.

Can soft-story retrofits be done with tenants in place? Yes, most soft-story retrofits can be completed with tenants in place. Steel moment frame installation typically occurs at ground level parking, minimizing disruption to residential units above. Some temporary parking relocation may be required.

Do I need a structural engineer for apartment building renovations? Any renovation involving structural modifications—load-bearing walls, new openings, floor system changes, or seismic upgrades—requires a licensed structural engineer. West Hollywood Building Department requires PE-stamped plans for structural work.

How does West Hollywood's housing element affect apartment development? West Hollywood's Housing Element encourages multi-family development, especially affordable housing. Density bonuses, streamlined permitting, and reduced parking requirements are available for qualifying projects. Contact the Planning Department for specific incentives.

Can existing apartment buildings be expanded vertically? Vertical additions are possible but require careful structural analysis. The existing foundation and framing must be evaluated for capacity to support additional loads. Seismic upgrading of the entire building is often required as part of vertical additions.

What special inspections are required for apartment construction? Required inspections include: concrete placement, reinforcing placement, welded connections, bolted connections, wood shear walls, and fire-resistive assemblies. Soft-story retrofits require steel connection inspections and special moment frame verification.

---

---

*Need an apartment building structural engineer in West Hollywood? Contact AAA Engineering Design at (949) 981-4448 for expert multi-family structural design and soft-story retrofit services. Our PE-licensed team has extensive experience with West Hollywood's unique requirements.*

Need Professional Engineering Services?

Our licensed Professional Engineers are ready to help with your project. Get a free consultation to discuss your structural engineering needs.

Related Articles

Continue exploring our engineering insights

Cost Guides
Feb 24
15 min read

Structural Engineer Cost in Orange County: 2026 Price Guide ($500-$15,000)

Structural engineer cost in Orange County ranges $500-$15,000 in 2026. See exact pricing by project type, city rates & what affects fees. Call (949) 981-4448.

Structural Engineering
Feb 24
15 min read

Brewery & Winery Structural Engineering in Lakeside: Design, Permits & Code 2026

Brewery and winery structural engineering in Lakeside. Equipment loads, tank foundations, tenant improvements & permits. Call (949) 981-4448 for a quote.

Structural Engineering
Feb 24
14 min read

Basement Structural Engineering in Manhattan Beach: Subterranean Design Guide 2026

Basement structural engineering in Manhattan Beach—subterranean design, waterproofing, and seismic compliance. Licensed PEs. Call (949) 981-4448.

Get Started

Ready to Start Your Project?

Get a free consultation and detailed quote for your engineering project. Our licensed Professional Engineers are ready to help bring your vision to life.

Contact Information

Office

8031 Main Street
Stanton, CA 90680

Business Hours

Monday-Friday 9:00 AM - 5:00 PM

Saturday Closed

Sunday Closed

Why Choose Us?

Free consultation & quote
24-hour response guarantee
Licensed Professional Engineers
100% satisfaction guarantee

Get Your Free Consultation

Complete the form and receive your consultation within 24 hours.

Personal Details

Project Details

We respect your privacy and never share your information.

Expert Online

Have a question about your project? Get a free consultation now.